Do I need a permit for a new dock in Coral Gables?

Yes. The City of Coral Gables requires a completed, notarized Public Works Department dock/mooring/wharf permit application, and the submitted plans need preliminary approval from Miami-Dade DERM before the city will move forward. Plans must show dimensions across the waterway and note any existing mangroves on the property.

Can I build a dock on the Coral Gables Waterway?

Docks are common along the roughly 8-mile Coral Gables Waterway that George Merrick's Coral Gables Corporation dug in the 1920s, but every dock plan must show the waterway's width at that point and get DERM sign-off before the city issues a permit. Cocoplum, whose Yacht Club connects directly to the Waterway, is a typical example of a community built around this canal system.

Coral Gables Conditions

What docks looks like in Coral Gables

Coral Gables sits inside Miami-Dade County's High-Velocity Hurricane Zone, where the Florida Building Code requires standard (Risk Category II) structures to be engineered for wind loads up to 175 mph. The city's Public Works Department also actively monitors the Coral Gables Waterway as an indicator of sea-level rise and aquatic health.

The Coral Gables Waterway is an approximately 8-mile canal system dug in the 1920s under developer George Merrick's "American Venice" plan, running from Biscayne Bay west to Cartagena Plaza before curving north alongside Riviera Drive toward the Biltmore Golf Course.

Coral Gables requires a notarized Public Works Department dock/mooring/wharf permit application with electronic plan submittal.

Dock plans must show dimensions across the waterway and any existing mangroves, per the city's permit requirements.

Gables Estates and Old Cutler Bay sit on deep water with direct bay access and no bridges, a different dock-engineering consideration than interior Waterway canals.

We regularly work in Gables Estates, Cocoplum and Old Cutler Bay, and coordinate permitting with the City of Coral Gables Development Services Department (Building Division and Public Works Department), which requires preliminary approval from Miami-Dade DERM before it will approve any work at or below the waterline; projects touching navigable water can also require U.S. Army Corps of Engineers and Florida DEP review, and the city's Board of Architects (plus Historic Preservation staff in historic districts) reviews anything visible from the water or street.

Full Service Details

For the complete breakdown of our docks process, materials, and options, see the full Docks page. Want to explore other cities we serve? Visit Areas Served.

FAQs

Docks in Coral Gables — Frequently Asked Questions

The city requires a signed, notarized Public Works Department permit application plus electronic drawings — site plan, floor plan, and installation sections and details — uploaded through the city's electronic submittal system, along with Miami-Dade DERM's preliminary approval.

Ready to build on the water in Coral Gables?

Tell us about your Coral Gables property and what you need built — we'll follow up to schedule a site visit and put together a quote.

Call NowGet a Quote